Case Studies.

SHEFFIELD CHILDREN’S HOSPITAL – CASE STUDY

Project: Sheffield Children’s Hospital Architect: Avanti Architects Client: Datim and Arkoni Total Contract Value: £40M Introduction Sheffield Children’s Hospital has undergone a £40m redevelopment over the last three years to bring it up to modern standards. Construction work commenced [...]

PETERBOROUGH CITY HOSPITAL

Peterborough City Hospital, is now regarded as the City’s most significant building project since the cathedral was built in 1238. The healthcare campus features: a 612-bed, 22-theatre Major Acute Hospital; a 98-bed Mental Health Unit; [...]

WRIGHTINGTON HOSPITAL, LANCASHIRE

The design of the new £18 million facility at Wrightington Hospital has been developed for client Wrightington, Wigan & Leigh (WWL) NHS Foundation Trust and is being undertaken by Integrated Health Projects (IHP), a joint [...]

WELLAND CENTRE, ST MARY’S HOSPITAL

The Welland Centre is a purpose built mental health inpatient centre that covers the population of Kettering, Corby, Wellingborough, Rushden and surrounding towns and villages. Fleet architects specified BetweenGlassBlinds for the project. Fleet Architects of [...]

LARGE BATTERY POWERED INSTALLATION

BetweenGlassBlinds have recently completed a large installation of 52 blinds for a large residential project in North London.  The team at BetweenGlassBlinds worked closely with the client in order to fully understand the customers’ needs [...]